| The top of the matching corner fireplace on the porch. There was no porch floor when they built this, so that meant a lot more scaffolding. |
![]() |
| The portion of the chimney outside coming up through the sun deck. |
![]() |
| Water heater |
![]() |
| HVAC crew has most all the vents installed now. |
![]() |
| It was a real surprise the day I found this in the upstairs study. It certainly showed the floor was strong. |
![]() |
| Forms finally went up this week for concrete for the kennel. |
![]() |
| The far side of the garage with door installed and siding finished. |
![]() |
| The septic system was installed last week and they ran the water line to the house. |
![]() |
| More of the garage. They installed doors and finished the siding since the last entry. |
![]() |
| Testing out some paint colors. They are a little more green than they appear here. |