| I think the only noticeable change in this photo is the front door had been installed, and they finished the siding and trim around it. |
![]() |
| The sidewalk from house along garage to kennels was poured on the 27th. |
![]() |
| Front doors arrived along with all our remaining exterior doors. |
![]() |
| French doors that will lead to back porch. We have to wait until the porch concrete it poured before they can install these. |
![]() |
| Metal decking on the porch. Framing and pouring concrete will be next hopefully. |