Tuesday, July 31, 2012

Sidewalks and Doors

I think the only noticeable change in this photo is the front door had been installed, and they finished the siding and trim around it.
The sidewalk from house along garage to kennels was poured on the 27th.




Front doors arrived along with all our remaining exterior doors.

French doors that will lead to back porch. We have to wait until the porch concrete it poured before they can install these.

Metal decking on the porch. Framing and pouring concrete will be next hopefully.

A Monday morning view after two sections of the concrete had to be torn out. This long section had a curve in it initially, which looked nice, but wouldn't go well with the breezeway, as it will not have a curve. The smaller section was removed so the cleanout could be moved and wouldn't be in the middle of the sidewalk.